Supplementary notes can update existing programs or describe adjacent work. They are not extra adoption counts.
KOC’s new production contract includes AI; the workflow is still unspecified
Baker Hughes reports a KOC contract covering production, digital and AI-enabled solutions.
No measured outcome, implementation cost or ROI reported.
Limits: Award does not establish operating AI. The release lists a separate KOC drill-bit award; do not merge them. No connection to existing KOC seismic or rig-scheduling projects established.
Baker Hughes Announces Third-Quarter 2026 Results · 2026-10-27
SANAD helps drilling engineers find the procedure they need
KOC describes SANAD, a drilling knowledge assistant developed with SLB and piloted by its North & West Kuwait Drilling Group.
A later engineer interview reports one Lower Burgan well finished 13 days early and SOP-related savings of about KD 97,000 per well. It does not isolate SANAD’s contribution; neither figure is counted as an AI result or ROI.
Limits: No active-user count, output error rate, full cost or matched baseline is disclosed. Potential benefits across 47 wells are an extrapolation, not an achieved rollout. CAPEX, stage-gate and production modules remain roadmap items. This is separate from G Agent scheduling in AI-085.
SANAD AI: The Generative AI Drilling Assistant · 2026-Q2
KOC’s Sanad uses AI to unlock drilling knowledge · 2026-09-29