Sunya / Energy AI researchOil India
Operator-reported deployment; report also calls the tool a prototype
Read the evidence, what it covers and what is still unclear.
Read the source-linked updates or inspect technology notes.
Later research and source checks
Supplementary notes can update existing programs or describe adjacent work. They are not extra adoption counts.
Oil India reports a well-screening tool in use on 150 wells
Oil India reports its Well Portfolio Optimizer deployed on 150 Upper Assam wells in FY 2025–26.
150 wells measures deployment reach. Achieved production gains, costs and net ROI are not reported.
Limits: Predicted gains are not achieved gains. No independent outcome validation or autonomous field control established. Keep this operating scope separate from DRIVE 2.0’s proposed 380-well scope; overlap is unknown. The original filing was read via a public mirror, not the issuer website.
Oil India Integrated Annual Report 2025–26 — stock-exchange filing · 2026-08-25
Oil India’s plan connects field operations with corporate systems
Oil India describes ten DRIVE 2.0 workstreams, including a control centre, a digital oilfield covering 380 producing wells, subsurface agents, maintenance and corporate workflows.
The 380 wells are planned scope, not a verified connected population. No measured uplift, savings, implementation cost or net ROI.
Limits: One undated issuer plan, now accessible after an earlier blocked route. No completion dates, live user population or model providers established. Ten workstreams are not ten operating AI deployments.
Digitalization in OIL — DRIVE 2.0 programme · Undated