Plant digitization was less reliable on complex systems
42.4% relationship recall at 100 predictions. Gas-plant documents; approximately 1,500 ReMi in supplied collection, not verified live deployments. Preprint 5 November 2025; evaluation/operating dates unknown.
Authors provide technical tests, not realized time savings or full-cost ROI. Do not merge abstract summary accuracy with task-specific tables or label this a cancelled rollout. The 95% component and 90% assignment measures concern separate final tasks.
Read the case and original sources