Pick the file that fits the conversation.

The register contains the current project records. The PDFs and deck are dated selections. They are useful to send around, but they do not automatically include later website updates.

Initial source screen: 26 September 2024–26 September 2026. Broad classification review: 8 October 2026. Selected register updates through 25 October 2026; supplementary research through 2 November 2026.

Current records and research

FileUpdatedWhat it covers
Earnings coverage and passages · JSON2026-11-06Historical grid plus targeted Q3 2026 extension. Full transcript screens, selected Q&A, prepared remarks, releases and access gaps remain distinct.
Earnings coverage · CSV2026-11-06Historical grid plus targeted Q3 2026 extension. Full transcript screens, selected Q&A, prepared remarks, releases and access gaps remain distinct.
Earnings passages · CSV2026-11-06Historical grid plus targeted Q3 2026 extension. Full transcript screens, selected Q&A, prepared remarks, releases and access gaps remain distinct.
Earnings review · cited text2026-11-06Historical grid plus targeted Q3 2026 extension. Full transcript screens, selected Q&A, prepared remarks, releases and access gaps remain distinct.
Operating results · reading view2026-11-0618 selected comparisons and assessments, including stopped use cases, historical limited-value trials and technical tests. Each retains population, period, source and limitations.
Operating results · chart data2026-11-06Same 18 bounded comparisons and assessments; different measures are not a ranking or complete ROI.
SLB chemical dosing · vector figure2026-10-25Nearly 1,400 Permian wells; separate 20-month performance and first-nine-month supplier-reported net savings.
Company knowledge and executive assistants2026-11-02Thirteen selected comparisons: KOC SANAD added 18 October; PTTEP X.brain and Devon ChatDVN checked 21 October; ADNOC Frontier plans added 2 November. Earlier reviews retain dates; no accepted Frontier scope or AI executive established.
Operating technology · JSON2026-11-07Automation, internal software and technology foundations, with source and AI-attribution limits.
Operating technology · CSV2026-11-07Same technology observations in tabular form.
Operating technology · cited notes2026-11-07Readable source-linked technology observations.
Latest source review · 2 November2026-11-07Neste shipping, Tenaris factory tools, Gazprom Neft RPA and Exxon automated rigs; earlier reviews retained with their dates and limits.
Visual evidence and limits · JSON2026-11-07Dated exhibits plus reported TotalEnergies use-case non-retention, with corroboration limits.
Operator limits and stopped-work research2026-11-07Historical searches and dated follow-ups, including source limits for reported non-retention.
What changed in this research pass · 14 October2026-10-25Aramco core labs, clarified Exxon/Ecopetrol/PETRONAS/Chord profiles, TotalEnergies digital planning and two technical studies.
More operating detail · 14 October2026-10-25Xinjiang diagnostics, CNX methane, HG Oil, Santos and two KPMG surveys; source dates and benefits kept separate.
Industry report library · JSON2026-11-07Current report entries, populations, methods and limitations.
Industry report library · CSV2026-11-07Same current industry publications in tabular form.
14 October research update2026-10-25CNX current-use disclosure, Aker BP implementation announcement, anonymous failure note and existing Expand evidence.
Complete initiative register · CSV2026-10-25All 306 profiles, with targeted source checks through October 25; supplementary technology context is reported separately.
Complete initiative register · Excel2026-10-25Same rows and values as the CSV, with filters.
Complete dataset · JSON2026-11-07Records, source entries, disclosures, provenance and dossiers.
Project histories · CSV2026-10-25Current histories, including the field additions and targeted Presidio, Aramco and EOG updates. Account briefs retain their own dates.
Flywheel Energy — company research2026-10-25Existing AI app platform, hiring intentions, conventional software context and source-access limits; reviewed 12 October.
Visual industry briefing2026-10-25Three industry findings, six workflows, four measurement examples and source-linked follow-up questions; editorial edition of 25 October.
Visual industry briefing · six-page PDF2026-10-25Portable six-page edition of the October 25 synthesis; source links and measurement limits retained.
Visual industry briefing · data2026-10-25Canonical evidence counts joined to selected workflow explanations and proposed questions.
Compare twelve real projects2026-10-25Action authority, asset scope, measurement limits and proposed evaluations; includes original source locations.
Twelve-project comparison · CSV2026-10-25The same case fields and proposed evaluation questions as the interactive comparison.
Twelve-project comparison · JSON2026-10-25Structured editorial comparison and source metadata; no new adoption classifications.
SLB data and AI thesis2026-10-25Original-source assessment, reported Digital economics, data rights and questions for the investment case.
SLB thesis and chart data2026-10-25Source metadata and reported segment figures; AI-only economics remain unknown.
SLB cited briefing2026-10-25Portable text edition of the targeted October 24 assessment.
Three field cases worth studying2026-10-25BPX, Burk and Expand: operating details, measurement limits and original sources; EOG context kept separate.
October 10 research review2026-10-25Findings, research leads and limits; not additional deployment counts.

Dated reports and exhibits

FileEditionWhat it covers
Eight-company comparison2026-10-08Eight selected upstream companies; not the complete register.
Exhibit deck · PDF2026-10-08Selected exhibits. Does not include the new chart gallery or October 10 source updates.
Exhibit deck · editable2026-10-08Editable version of the same dated exhibit selection.
Industry takeaways2026-10-08Industry evidence counts and selected exhibits as of this edition.
Research atlas2026-10-07Four exhibits from the October 7 assessment.
Supplementary research2026-10-09Selected supplementary notes; not all later findings or an updated full report.

Send a reading pack

Download the reading pack · assembled 2 November 2026

Includes the current register, project histories and all 24 operator/provider evaluation briefs for the twelve-project comparison, plus the dated comparison and supplementary reports listed above. The README explains each edition. Original source publishers may require access.

Browse all sources and downloads